Production et Exploitation Minière

Production et Exploitation Minière

Dans le cadre de l’équipe Production, Exploitation minière et Gestion allégée, vous assurez le fonctionnement efficace du cycle de production et l’entretien de tous les processus impliqués. Vous nous aidez à optimiser notre processus de production pour maximiser la qualité de nos produits.

Titre Lieu Job Category Modèle de Travail
Analista de Melhoria Contínua PL
Analista de Melhoria Contínua PL Brumado, BR, 46100-000 Mining 26 nov. 2026
Brumado, BR, 46100-000 Mining Fully On-Site
Mecânico (a) Manutenção I
Mecânico (a) Manutenção I Brumado, BR, 46100-000 Manufacturing 26 nov. 2026
Brumado, BR, 46100-000 Manufacturing Fully On-Site
Operador (a) Auxiliar Produção
Operador (a) Auxiliar Produção Contagem, BR, 32210-050 Manufacturing 26 nov. 2026
Contagem, BR, 32210-050 Manufacturing Fully On-Site
Lehre Metalltechnik (w/m/d)
Lehre Metalltechnik (w/m/d) Hochfilzen, AT, 6395 Manufacturing 25 nov. 2026
Hochfilzen, AT, 6395 Manufacturing Fully On-Site
Lehre Mechatronik (w/m/d)
Lehre Mechatronik (w/m/d) Hochfilzen, AT, 6395 Manufacturing 25 nov. 2026
Hochfilzen, AT, 6395 Manufacturing Fully On-Site
Lehre Elektrotechnik (w/m/d)
Lehre Elektrotechnik (w/m/d) Hochfilzen, AT, 6395 Manufacturing 25 nov. 2026
Hochfilzen, AT, 6395 Manufacturing Fully On-Site
Lehre Metalltechnik (w/m/d)
Lehre Metalltechnik (w/m/d) Radenthein, AT, 9545 Manufacturing 25 nov. 2026
Radenthein, AT, 9545 Manufacturing Fully On-Site
Lehre Elektrotechnik (w/m/d)
Lehre Elektrotechnik (w/m/d) Radenthein, AT, 9545 Manufacturing 25 nov. 2026
Radenthein, AT, 9545 Manufacturing Fully On-Site
Auxiliar de Limpeza
Auxiliar de Limpeza Brumado, BR, 46100-000 Mining 25 nov. 2026
Brumado, BR, 46100-000 Mining Fully On-Site
Lehre Labortechnik Chemie & Chemieverfahrenstechnik (w/m/d)
Lehre Labortechnik Chemie & Chemieverfahrenstechnik (w/m/d) Radenthein, AT, 9545 Manufacturing 25 nov. 2026
Radenthein, AT, 9545 Manufacturing Fully On-Site
Operador de mineração II
Operador de mineração II Onca De Pitangui, BR, 35655-000 Mining 25 nov. 2026
Onca De Pitangui, BR, 35655-000 Mining Fully On-Site
Production Line Leader
Production Line Leader Tlalnepantla, MX, 54030 Mining 25 nov. 2026
Tlalnepantla, MX, 54030 Mining Fully On-Site